COMPLETE / PARTIAL POOL OPENING:

Clean and remove winter cover**

Adjust water level to proper height**

Assemble and start filtration system

Install handrails, ladders, and light

Test and balance water chemistry

Wash down pool decking if necessary

**Not included in a partial pool opening

 

COMPLETE / PARTIAL POOL CLOSING:

Lower water level**

Add winter chemicals to water

Blow out pool lines

Remove ladders and handrails

Lubricate pump

Install the winter cover**

**Not included in a partial pool closing